A press rebuild in seventy-two hours
A cracked cylinder on a 1,200-tonne press, a bank-holiday weekend and a line that had to run on Tuesday. How the job was planned and done.
-

The safety walk we do before every shutdown
An hour on foot, a clipboard and the plant’s own operators. Why the most useful part of a shutdown happens a week before it starts.
-

Pipe spools: build them in the shop or on site?
Prefabrication saves time on site, but not always. The four questions we ask before deciding where a spool gets welded.
-

Standing up a steel frame in six weeks
How the frame for a harbourside logistics hub went from bare slab to roof sheeting in forty-two working days.
-

Can an old factory roof take solar panels?
Usually yes, often with some help. What a structural survey looks at before a single panel goes up.
-

Six new apprentices in the fabrication shop
Four welders and two pipefitters start their four-year apprenticeships with us this autumn.