Made to order in four to eight weeks · delivered into the room See the lead times

Why it takes six weeks

A hammer and a scatter of nails on a plain ground

A fortnight of that is the timber sitting in the workshop doing nothing. Boards come out of a kiln at a lower moisture content than a house, and a table cut the day the wood arrives is a table that moves in its first winter.

Then the joints. A drawbored mortise and tenon takes an hour a leg, against a minute for a bolt. It is also the reason a hundred-year-old table is still tight and a ten-year-old flat-pack is not.

The last week is oil. Hardwax oil goes on thin, three coats, and each one wants a day. Rushing it gives you a surface that marks in a month, and we have tried.